Harton
Harton POD Systems Below ground water mains pumping station
Harton Plumbing Units - main page
Harton BoosterSets Hartons Other Products
Contact Us back to home page..
Our site is best viewed in 1024 x 768 or 800 x 600 screen res. and in Full Screen ('F11')
Harton Services, Unit 6, Thistlebook Industrial Estate, Eynsham Drive, London SE2 9RB
Tel: 020 8310 0421 - Fax: 020 8310 6785 - Email: info@hartons.co.uk
 
Harton Plumbing Units
  Suitable for SEALED HEATING SYSTEM...
Click on a plumbing system below to jump to more details: ..
Plumbing System 3 - click to information Plumbing System 4 - click to information Plumbing System 7 - click to information Plumbing System 8 - click to information Plumbing System 10 - click to information Plumbing System 11 - click to information
System 3 System 4 System 7 System 8 System 10 System 11
For sealed heating system For a flat with electric supply only For sealed heating system For sealed heating system Compatible with gas fired boiler system Compatible with gas fired boiler system
           
[top]

Plumbing System 3 Suitable for sealed heating system.

Standard Plumbing Unit with indirect hot water cylinder and cold water storage.

This unit includes the following:

  • Welded steel frame assembly
  • Sealed cold water storage tank, including ball valve and overflow connection
  • Insulated hot water cylinder with an immersion heater boss capped
  • Interconnecting pipe work and isolation valves between the storage tank and cylinder, including a cold down service

This unit requires (by others) a 3Kw power supplies to the immersion heater, an incoming water main, overflow connnection, domestic hot and cold water services connections, and primary connections.

As an optional extra, Harton can offer a fitted immersion heater with or without controls.

Download .pdf file for this system (3) Requires Adobe Acrobat Reader to view (Download HERE)
<download tip>    
Plumbing System 3
[top]

Plumbing System 4

Plumbing System 4 Suitable for a flat with electric supply only.

Standard Plumbing Unit with direct hot water cylinder and boosted hot and cold water services.

This unit includes the following:

  • Sealed cold water storage tank, including ball valve and overflow connection
  • Insulated hot water cylinder with two immersion heater bosses capped
  • Integrated twin 1.5 bar negative head pump boosting the hot and cold water services (larger duty pumps available)
  • Interconnecting pipe work and isolation valves between the storage tank and cylinder including a cold down service.

This unit requires (by others) a 5amp spur to the domestic booster pump, and two 3Kw power supplies to the immersion heaters, an incoming water main, overflow connection, and domestic hot and cold water services connections.

As an optional extra, Harton can offer fitted immersion heaters and immersion heater timer/boost controls.

Download .pdf file for this system (4) Requires Adobe Acrobat Reader to view (Download HERE)
<download tip>    
[top]

Plumbing System 7 Suitable for sealed heating system.

Standard Plumbing Unit with indirect hot water cylinder, cold water storage and boosted hot and cold water services.

This unit includes the following:

  • Sealed cold water storage tank, including ball valve and overflow connection
  • Insulated hot water cylinder with back up immersion heater
  • Integrated twin 1.5 bar negative head pump boosting the hot and cold water services (larger duty pumps available)
  • Interconnecting pipe work and isolation valves between the storage tank and cylinder including a cold down service.

This unit requires (by others) a 5amp spur, to the domestic booster pump, and a 3Kw power supply to the immersion heater, an incoming water main, overflow connection and domestic hot and cold water services connections.

Download .pdf file for this system (7) Requires Adobe Acrobat Reader to view (Download HERE)
<download tip>    
Plumbing System 7
[top]

Plumbing System 8

Plumbing System 8 Suitable for sealed heating system.

Standard Plumbing Unit with indirect hot water cylinder, cold water storage and boosted hot and cold water services.

This unit includes the following:

  • Sealed cold water storage tank, including ball valve and overflow connection
  • Insulated hot water cylinder with backup immersion heater
  • Integrated twin 1.5 bar negative head pump boosting the hot and cold water services (larger duty pumps available)
  • Interconnecting pipe work and isolation valves between the storage tank and cylinder, including a cold down service

This unit requires (by others) a 5amp spur to the domestic booster pump, and a 3Kw power supply to the immersion heater, an incoming water main, overflow connection, and domestic hot and cold water services connections.

Download .pdf file for this system (8) Requires Adobe Acrobat Reader to view (Download HERE)
<download tip>    
[top]

Plumbing System 10 The unit is compatible with a gas fired boiler system.

Plumbing Unit with indirect hot water, boosted hot and cold water and sealed heating system with controls.

This unit includes the following:

  • Sealed cold water storage tank with ball valve and overflow connection
  • Insulated hot water cylinder with back up immersion heater
  • Integrated twin 1.5 bar negative head pump boosting the hot and cold water services (larger duty pumps available)
  • Integrated heating pump
  • Sealed expansion vessel and filling loop
  • Interconnecting pipe work and isolation valves between the storage tank and hot water cylinder including a cold down service
  • Interconnecting pipe work and electrical control valves between the cylinder and heating flow and returns.

The unit also includes electrical wiring terminating into a wiring centre mounted on the unit. A programmer and room stat can be supplied loose for wiring (by others) from their remote location into the integrated wiring centre.

This unit requires two 5amp spurs, one to the integrated wiring centre, the other to the domestic booster pump, and a 3Kw power supply to the immersion heater, an incoming water main, overflow connection, distribution heating flow and return and domestic hot and cold water services connections.

Download .pdf file for this system (10) Requires Adobe Acrobat Reader to view (Download HERE)
<download tip>    
Plumbing System 10
[top]

Plumbing System 11

Plumbing System 11 The unit is compatible with a gas fired boiler system.

Plumbing Unit with indirect hot water, boosted hot and cold water and sealed heating system with controls.

This unit includes the following:

  • Sealed cold water storage tank with ball valve and overflow connection
  • Insulated hot water cylinder with back up immersion heater
  • Integrated twin 1.5 bar negative head pump boosting the hot and cold water services (larger duty pumps available)
  • Integrated heating pump
  • Sealed expansion vessel and filling loop
  • Interconnecting pipe work and isolation valves between the storage tank and hot water cylinder including a cold down service
  • Interconnecting pipe work and electrical control valves between the cylinder and heating flow and returns.

The unit also includes electrical wiring terminating into a wiring centre mounted on the unit. A programmer and room stat can be supplied loose for wiring (by others) from their remote location into the integrated wiring centre.

This unit requires two 5amp spurs, one to the integrated wiring centre, the other to the domestic booster pump, and a 3Kw power supply to the immersion heater, an incoming water main, overflow connection, distribution heating flow and return and domestic hot and cold water services connections.

Download .pdf file for this system (11) Requires Adobe Acrobat Reader to view (Download HERE)
<download tip>    
[top]
 Copyright © Hartons